Project Scope:
The existing corrugated steel pipe at Station Road, Lake Proserpine had corroded over time. To repair the pipe and add durability, the existing culvert was extended approximately 4 meters and the pipe was cleaned before being relined with potable water friendly materials.
This job was designed and constructed by Hillery Group and all works met the relevant Department of Transport and Main Roads (DTMR) Standard Specifications and Drawings.
As the works took place on a road frequented by caravans and B Doubles, it was ensured that there was minimal effect on local traffic. This ensured that Station Road remained usable by the public and did not cause any disruption to travellers, including holidaymakers and workers.
The installation of a head wall on the downstream side of the pipe and placement of rock both up and down stream ensured the pipe did not impact the natural water flow, while still ensuring the pipe was durable.
CEO – x years
Ops Manager – 30 years on similar projects with 5 years on multiprojects
Site Supervisor – x years experience, (Fred)
Client: Whitsunday Regional Council
Contract Period: August 2020 – September 2020
Contract Value: $285,000
Thank you for contacting Hillery Group.
We will be in touch soon.
Positive feedback from client, media or users such as residents and tourists
— Caravaner
Lake Proserpine, Station Road area
Contact us for any enquires
ABN: 82 633 919 990